设为首页
收藏本站
联系我们
...............................................................................................................................
Today's
TheProgrammed ofdevelopment
The Procedure For Examining
>>>Investing Environment
WATER SUPPLYING AND DRAINING OFF
 The running water company of the city will supply water used in the Zone. Water supplying pipes will be laid according to the supplying request, 12000 Ton a day. A second level fire station will be set up in the southern area.
 Rainwater and polluted water will be drained separately in the Zone. The polluted water will be drained off to the lower reaches of Lishui River after it is disposed by the sewage treatment plant.
POWER SUPPLYING
  Electricity used in the Zone area will be connected with electric mains of the city. A substation of 110kv will be built in the Zone. It can provide all the electricity needed for workshops and service facilities.
ENVIRONMENTAL PROTECTION
 
The Zone will be a modern scientific and technological industry one which is beautified overall and surrounded by clear water. Strictly carrying out the policy that the rainwater and polluted water should be drained separately; and strictly controlling the polluting enterprises.
 

AFFORESTING
  Outside the road along the river, in the north Zone, a greenbelt for sightseeing with 20-120 meters will be built here; And afforesting the area by drawing back from Yongding Road about 8-10 meters. Portraying the central commercial square as the ecologically afforesting square. Planning every workshop to be in totally green.

 
  .............................................next...........................................

版权所有 Copyright © 2002-2003 张家界科技工业园 All Rights Reserved

张家界市永定区信息化工作办公室设计、制作 www.zjjyd.gov.cn